Here is the Phase 2 construction update at Wing Samui Condo for the second week of November 2026, building by building, with the latest photos from site.

Wing Samui Construction Update, 2nd Week November 2026

Building 8

Building 8, Wing Samui Condo construction, 2nd Week November 2026

The stair railing and aluminium frame are being installed, grout is being applied to the tiles, and the window openings are being adjusted to size. On the MEP side, joint boxes, wire way pipes and plastic trunking are being installed, and the large joint box is being connected to the main board. Joint boxes are where the electrical cables are joined and branched, trunking is the enclosed channel that carries cables along the walls, and the connection to the main board links the building's circuits to its main supply point.

Building 9

Building 9, Wing Samui Condo construction, 2nd Week November 2026

Floor tiles are being laid on the balconies, in the toilets and across the interior areas. C-line is being installed in the toilets. The floor tiling gives each of these spaces its finished, hard-wearing surface.

Building 10

Building 10, Wing Samui Condo construction, 2nd Week November 2026

Blockwork, studs and lintels are under way with kicker works, and corner bead is being fixed and plaster applied to the exterior wall. Studs and lintels are the small reinforced concrete columns and beams cast into the masonry to tie it to the frame and carry it over openings, and the kicker is the concrete upstand at the base of the walls that protects them from moisture. Corner bead keeps the plastered corners straight and protected, and the plaster gives the façade a sealed, even surface.

Building 11

Building 11, Wing Samui Condo construction, 2nd Week November 2026

The WC walls are being tiled, lines are being set out for the floor tiles, materials are being brought up, and the balcony railing and aluminium are being installed. On the MEP side, SN pipes are being installed. Setting out lines marks the tile layout so the courses run level and true, and SN pipe is rigid drainage pipe whose SN rating denotes its ring stiffness.

Building 12

Building 12, Wing Samui Condo construction, 2nd Week November 2026

The exterior wall is being plastered and the steel railing is being installed along the corridor. Plaster gives the outer walls a sealed, even surface ready for painting. The railing forms the permanent safety barrier along the open edge of the corridor.

Building 13

Building 13, Wing Samui Condo construction, 2nd Week November 2026

Work is under way on the interior corner walls, studs and lintels are being cast, and wire mesh is being installed. On the MEP side, mixing valves are being installed. Mixing valves blend hot and cold water to a safe, steady temperature at the shower, and the studs and lintels tie the masonry to the concrete frame.

Building 14

Building 14, Wing Samui Condo construction, 2nd Week November 2026

The interior walls are being plastered. On the MEP side, EE pipes and wiring are being installed. Plaster is the layer applied over blockwork to smooth and seal it, and EE pipes are the conduit that carries the electrical wiring through the walls.

Swimming Pool

Swimming Pool, Wing Samui Condo construction, 2nd Week November 2026

At the Jacuzzi pool, formwork support beams and the floor are being installed, the steel beams and slab are being placed, and pipe sleeves are being installed for the pool system. Formwork is the temporary mould that holds concrete in shape until it has set. The pipe sleeves are openings cast into the concrete so the pool pipework can pass through later without cutting.

Other Work

A septic tank is being installed near Building 10. The septic tank receives and treats waste water from the buildings before it is discharged.

For enquiries, contact us on +66 88 887 7877, [email protected], LINE @wingsamui or WeChat wingsamuicondo.

Узнать о Wing Samui
Напишите нам Обычно отвечаем за несколько минут

Свяжитесь с отделом продаж сегодня, чтобы забронировать свой юнит.